Work is underway on a long-term fix to stabilize SR 108 in Whitwell (Marion County). The section of roadway had been gradually sliding, with pavement dropping and shifting over time.
Construction is scheduled for completion on Aug. 31, 2027.
Work is underway on a long-term fix to stabilize SR 108 in Whitwell (Marion County). The section of roadway had been gradually sliding, with pavement dropping and shifting over time.
Construction is scheduled for completion on Aug. 31, 2027.