MARION COUNTY I-24 resurfacing from near SR-27 (US-72) to east of SR-28: The contractor will be resurfacing on I‑24 in both directions from MM 152.2 to MM 156. Work will be performed Sunday nights through Thursday nights from 7 PM – 6 AM. Single‑lane closures will be set up.
MARION COUNTY SR-108 [2.8-3.24] slide mitigation: The contractor will be performing slide mitigation operations, including grading, drainage, and paving on SR‑108 at LM 2.8. The roadway will be reduced to one lane controlled by temporary signals. Project completion date is 08/31/2027.
MARION COUNTY SR-27 [2.73-4.22] from 2.73 to 4.22 resurfacing with cold in-place recycling (CIR): Resurfacing operations on SR‑27 from north of SR‑56 (LM 2.7) to I‑24 (LM 4.2) in South Pittsburg. Single‑lane closure controlled by flaggers will be required. Please use caution.
MARION COUNTY SR-283 [2.69-8.11] from 2.69 to 8.11 resurfacing with Cold In-Place Recycling (CIR): Resurfacing operations on SR‑283 from near SR‑27 (LM 2.69) to the Sequatchie County line (LM 8.11). Single‑lane closure controlled by flaggers. Please use caution.
HAMILTON COUNTY I-75 at I-24 Interchange Reconstruction Phase 2: No interstate ramp or lane closures are scheduled for this period. If needed, the contractor may use short-duration (15 to 30 minute) rolling roadblocks for patching potholes, debris clearing, or guardrail/attenuator repairs.
HAMILTON COUNTY I-75 at the Hamilton Place Mall interchange: The SR‑153 southbound ramp to I‑75 northbound has been reduced to one lane. Traffic shifts have been implemented on I‑75 northbound/southbound, Shallowford Road entrance/exit ramps, and the Hamilton Place Mall exit ramp. Hamilton Loop Road is closed for retaining wall construction and drainage installation between intersections near Markman’s Jewelers and Texas Roadhouse. Nightly lane closures are permitted 8 PM to 6 AM. Motorists should use caution and watch for workers.
HAMILTON COUNTY SR-2 (BRAINERD RD.) Utility Work both directions at LM 14.75: Flagger‑assisted lane closures on SR‑2 (Brainerd Rd.) between Hunt Ave. and Aiken Dr. Motorists should reduce speed and be prepared to stop. Trucks, arrow board/message boards, flaggers, and barrels/cones will be present 08/10/2026 through 08/19/2026 from 9 am – 2 pm
HAMILTON COUNTY SR-2 [11.86-11.63] from 11.86 to 11.63 Missionary Ridge tunnel cleaning: The McCallie Tunnels will be cleaned 08/26/2026 from 8 PM to 6 AM, weather permitting. The contractor will clean one side at a time and flag traffic. Motorists should expect delays.
HAMILTON COUNTY SR-319 (HIXSON PK.) Utility Work both directions at LM 13.46: Flagger‑assisted lane closures on SR‑319 (Hixson Pike) between Port Royal Dr. and Berry Lane. Motorists should reduce speed and be prepared to stop. Trucks, arrow board/message boards, flaggers, and barrels/cones will be present 08/03/2026 through 08/12/2026 from 9 am – 2 pm
HAMILTON COUNTY SR-319 (HIXSON PK.) Utility Work both directions at LM 15.23: Flagger‑assisted lane closures on SR‑319 (Hixson Pike) between W. Wind Dr. and Igou Ferry Rd. Motorists should reduce speed and be prepared to stop. Trucks, arrow board/message boards, flaggers, and barrels/cones will be present 08/13/2026 through 08/19/2026 from 9 am – 2 pm
HAMILTON COUNTY SR-319 (HIXSON PK.) Utility Work both directions from LM 8.74 to LM 8.88: THIS IS NIGHTTIME WORK. Flagger‑assisted lane closures on SR‑319 (Hixson Pike) between Eagle Dr. and Jackson Mill Dr. Motorists should reduce speed and be prepared to stop. Trucks, arrow board/message boards, flaggers, and barrels/cones will be present 08/10/2026 through 08/16/2026 from 9 pm – 6 am
HAMILTON COUNTY SR-320 [0.86-1.11] replacement of bridge over CSX railroad: Beginning 07/09/2026, the contractor will commence clearing operations on SR‑320 from LM 0.86 through LM 1.11 and will perform daily flagging operations from 7 AM to 5 PM. Motorists should use caution, paying attention to construction signage and watching for construction vehicles and personnel.
________________________________________________________________________________________________________________
HAMILTON COUNTY SR-321 (OOLTEWAH-RINGGOLD RD.) Utility Work both directions at LM 0.71: Flagger‑assisted lane closures on SR‑321 (Ooltewah‑Ringgold Rd.) between Mountainaire Dr. and E. Brainerd Rd. Motorists should reduce speed and be prepared to stop. Trucks, arrow board/message boards, flaggers, and barrels/cones will be present 08/13/2026 through 08/19/2026 from 9 am – 2 pm
HAMILTON COUNTY SR-321 (OOLTEWAH-RINGGOLD RD.) Utility Work both directions at LM 1.86: Flagger‑assisted lane closures on SR‑321 (Ooltewah‑Ringgold Rd.) between Standifer Gap and Mangate Way. Motorists should reduce speed and be prepared to stop. Trucks, arrow board/message boards, flaggers, and barrels/cones will be present 07/30/2026 through 08/12/2026 from 9 am – 2 pm
HAMILTON COUNTY SR-58 [2.17-4.55] from SR-17 to near 21st Street West resurfacing: Beginning 08/12/2026, the contractor will commence asphalt milling operations. Expect flagging operations between 8 PM and 6 AM. Motorists should use caution and watch for construction vehicles and personnel.
HAMILTON COUNTY SR-8 (CHEROKEE BLVD.) Utility Work both directions from LM 10.39 to LM 10.50: Flagger‑assisted lane closures on SR‑8 (Cherokee Blvd.) between Black St. and Frazier Ave. Motorists should reduce speed and be prepared to stop. Trucks, arrow board/message boards, flaggers, and barrels/cones will be present 08/07/2026 from 9 am – 2 pm
HAMILTON COUNTY SR-8 [11.67-11.75] from 11.67 to 11.75 Stringer’s Ridge tunnel cleaning: The Stringer’s Ridge Tunnel will be closed 08/26/2026 from 8 PM to 6 AM for cleaning. A detour will be in effect during the closure. This work is weather permitting.