BLEDSOE COUNTY SR-285 resurfacing from the Van Buren County Line (0.0) to SR-101 (3.2):Â The contractor will be working on SR-285 from the Van Buren County Line (LM 0.00) to SR-101 (LM 3.15) to resurface and install safety devices. This work will require single lane closures controlled by flaggers. Please use caution when driving through the work zone.
BLEDSOE COUNTY SR-301 resurfacing from SR-285 (0) to south of CC Road (0.9):Â The contractor will be resurfacing SR-301 from SR-285 (LM 0.00) to South of the CC Road (LM 0.90). This work will require single lane closures controlled by flaggers. Please use caution when driving through the work zone.
MARION COUNTY I-24 from east of Big Fiery Gizzard Creek (MM 146) to near SR-27 (US-72, MM 152): The contractor will be working on I-24 EB and WB from MM 146 to MM 152 to perform resurfacing operations. Work will be performed Sunday nights through Friday nights from 7 PM – 6 AM each night. No work will occur on Saturday nights. This work will require single lane closures in each direction leaving one lane open to traffic each way. THP and truck mounted attenuators will be on site during the work.
MARION COUNTY SR-108 resurfacing from SR-28 (LM 0) to Grundy County Line (LM 11):Â The contractor will be resurfacing SR-108 from SR-28 (LM 0.00) to the Grundy County Line (LM 11.01). This work will require single lane closures controlled by flaggers. Please use caution when driving through the work zone. [Asphalt Paving Systems, Inc./Dunlap/CNY056]
SEQUATCHIE COUNTY SR-111 TDOT Bridge Maintenance southbound at LM 2.81:Â TDOT Bridge Repair will be patching potholes in the deck of the SR111 ridge over Old Henson Rd. at LM 2.81. Work will take place on 7/29/24 starting at 8:00 AM local time. The right side of the south bound lane will be closed with traffic control in place.
SEQUATCHIE COUNTY SR-111 sinkhole and culvert repair at LM 3.3:Â The contractor is repairing a sinkhole and culvert on SR-111 near L.M. 3.3 in Sequatchie County. The Northbound lanes have been merged and shifted on to a Southbound Lane to move around the sinkhole work area. One lane of the Southbound traffic has been closed leaving one lane open. Please use caution when driving through the work zone.