shop-the-new-food-city-in-kimball

Road Construction in Marion and Grundy Counties

MARION COUNTY SR‑27 (US‑HWY. 72) TDOT Contractor westbound at LM 21.2:
Soil‑nailing operations by GSI will require closure of the westbound lane through 12/14/2026 on SR‑27 at LM 21.2. Temporary traffic signals will be in place.

GRUNDY COUNTY SR‑2 (US‑41) Utility Work both directions from LM 5.29 to LM 5.69:
Flagger-assisted lane closures on SR‑02 (US‑41 Hwy.) between Bells Cove and West Main St. Motorists should reduce speed and be prepared to stop. Trucks, arrow boards/message boards, flaggers, and barrels/cones will be present through 11/17/2026 from 9 a.m.–2 p.m.

GRUNDY COUNTY SR‑50 [13.23‑17.74] from Hideaway Cabin Road to SR‑56 resurfacing:
There will be daily flagging operations for resurfacing activities.