TDOT maintenance crews will be using rolling roadblocks with the help of the Tennessee Highway Patrol to set up a lane closure to make several needed repairs to the drainage system in the median of I-24 in Grundy County from MM 134 to 130.
The work will be conducted on Saturdays through Saturday, 3/2/24, and possibly 3/9/24 (if a rainout occurs on Saturday, work will be performed on Sundays). The work will take place from 7:00 am to 5:30 pm CST.