shop-the-new-food-city-in-kimball

Area Road Construction Update for August 5

BLEDSOE COUNTY SR-285 resurfacing from the Van Buren County Line (0.0) to SR-101 (3.2): The contractor will be working on SR-285 from the Van Buren County Line (LM 0.00) to SR-101 (LM 3.15) to resurface and install safety devices. This work will require single-lane closures controlled by flaggers. Please use caution when driving through the work zone.

BLEDSOE COUNTY SR-301 resurfacing from SR-285 (0) to the south of CC Road (0.9): The contractor will resurface SR-301 from SR-285 (LM 0.00) to the South of CC Road (LM 0.90). This work will require single-lane closures controlled by flaggers. Please use caution when driving through the work zone.

MARION COUNTY I-24 TDOT Maintenance westbound from MM 134.3 to MM 140.8: On 8/6, District 28 will begin setting traffic control at 8 a.m. central for interstate paving on I-24 EB.

MARION COUNTY I-24 from east of Big Fiery Gizzard Creek (MM 146) to near SR-27 (US-72, MM 152): The contractor will be working on I-24 EB and WB from MM 146 to MM 152 to perform resurfacing operations. Work will be performed Sunday nights through Friday nights from 7 PM – 6 AM each night. No work will occur on Saturday nights. This work will require single-lane closures in each direction, leaving one lane open to traffic each way. THP and truck-mounted attenuators will be on-site during the work.

MARION COUNTY SR-108 resurfacing from SR-28 (LM 0) to Grundy County Line (LM 11): The contractor will resurface SR-108 from SR-28 (LM 0.00) to the Grundy County Line (LM 11.01). This work will require single-lane closures controlled by flaggers. Please use caution when driving through the work zone.

SEQUATCHIE COUNTY SR-111 sinkhole and culvert repair at LM 3.3: The contractor is repairing a sinkhole and culvert on SR-111 near L.M. 3.3 in Sequatchie County. The Northbound lanes have been merged and shifted on to a southbound lane to move around the sinkhole work area. One lane of the Southbound traffic has been closed, leaving one lane open. Please use caution when driving through the work zone.