BLEDSOE COUNTY SR-28 (MAIN ST.) TDOT Maintenance northbound from LM 15.2 to LM 15.4: The right lane of two lanes northbound is shut down due to a sinkhole. Traffic is traveling in the unaffected lane. Southbound lanes are not affected.
BLEDSOE COUNTY SR-285 resurfacing from the Van Buren County Line (0.0) to SR-101 (3.2): The contractor will be working on SR-285 from the Van Buren County Line (LM 0.00) to SR-101 (LM 3.15) to resurface and install safety devices. This work will require single-lane closures controlled by flaggers. Please use caution when driving through the work zone.
BLEDSOE COUNTY SR-30 and SR-443, the grading, drainage, stream relocation, widening, and resurfacing on Summer City Road: The contractor will perform grade work and widening on Summer City Road in Bledsoe County. This work will narrow the lanes at LM 2.0 and LM 4.3 and will leave both lanes open to traffic. Please slow down and use caution when driving through the work zone.
BLEDSOE COUNTY SR-301 resurfacing from SR-285 (0) to south of CC Road (0.9):Â The contractor will be resurfacing SR-301 from SR-285 (LM 0.00) to South of the CC Road (LM 0.90). This work will require single lane closures controlled by flaggers. Please use caution when driving through the work zone.
GRUNDY COUNTY I-24 TDOT Maintenance westbound from MM 134 to MM 130:Â Maintenance to perform a rolling roadblock with the help of THP to set up a lane closure to make several needed repairs to our drainage system in the median of I-24. This will be weekend work only. Location: Grundy County Lane Closure: I-24 WB MM 134 to 130 #1 fast lane Date: Saturday 9/21/2024 Time: 7:00 am to 5:30 pm CST Notes: THP officers will be on the job site during this project.
MARION COUNTY SR-156 (STATE HWY. 156) TDOT Contractor both directions at LM 15.2:Â An in-depth inspection of the Shelby Rhinehart bridge, SR156 over the Tennessee River will result in daily lane closures from 7 AM until 4 PM from Monday, September 23 through Friday, September 27. A flagging operation will be used to direct traffic through the work zone. Motorists are advised to use caution when approaching the bridge and be prepared to stop.
MARION COUNTY I-24 from east of Big Fiery Gizzard Creek (MM 146) to near SR-27 (US-72, MM 152): The contractor will be working on I-24 EB and WB from MM 146 to MM 152 to perform resurfacing operations. Work will be performed Sunday night through Friday night from 7 PM – 6 AM each night. This work will require single lane closures in each direction leaving one lane open to traffic each way. THP and truck mounted attenuators will be on site during the work.
MARION COUNTY SR-108 resurfacing from SR-28 (LM 0) to Grundy County Line (LM 11):Â The contractor will be resurfacing SR-108 from SR-28 (LM 0.00) to the Grundy County Line (LM 11.01). This work will require single lane closures controlled by flaggers. Please use caution when driving through the work zone.