MARION COUNTY I-24 [156.4-160.2] from 156.4 to 160.2 resurfacing:Â The contractor will be performing resurfacing operations on I-24 EB and WB in Marion County from MM 156.4 East of SR-28 to MM 160.2 West of the Tennessee River. This work will require single lane closures, leaving one lane open in each direction each night worked. Resurfacing operations will be Sunday through Thursday from 6 PM CT – 5 AM CT. Please use caution when driving through the work zones.
MARION COUNTY SR-156 repair of bridge over Tennessee River, LM 15.2:Â The contractor will be performing painting operations and structural repairs on the SR-156 bridge over the Tennessee River in South Pittsburg. This work will require intermittent lane closures controlled by flaggers or a temporary traffic signal leaving one lane open. Please use caution when driving through the work zone.
MARION COUNTY SR-2 (DIXIE LEE AVE.) Utility Work both directions from LM 30.59 to LM 30.74:Â Flagger-assisted lane closures on SR-2(Dixie Lee Ave) at the Sullivan’s Landing TWRA Boat ramp. Motorists should reduce speed and be prepared to stop. Trucks, arrow board/message boards, flaggers, and barrels/cones will be present, through 09/17/25 from 9 am – 2 pm. [132273.00]
MARION COUNTY SR-27 (US-72) resurfacing from the Alabama State Line (LM 0) to north of SR-156 (LM 2.7):Â The contractor will be performing paving operations on SR-27 EB and WB in Bledsoe County from the Alabama state line to north of SR-156. This work will require single lane closures, leaving one lane open in each direction during daytime work hours. Please use caution when driving through the work zones.
BLEDSOE COUNTY SR-30 and SR-443, the grading, drainage, stream relocation, widening, and resurfacing on Summer City Road:Â The contractor will be performing grade work and widening on Summer City Road in Bledsoe County. This work will narrow the lanes at LM 2.0 and LM 4.3 and will leave both lanes open to traffic. Please slow down and use caution when driving through the work zone.
GRUNDY COUNTY I-24 TDOT Maintenance eastbound from MM 131 to MM 133:Â HDR will be drilling cores for an upcoming construction project (cross tile road bore). They will close down the outside #2 lane to be able to do this work safely. Date: 09/16/25 (rain days will be 09/17/25 or 09/18/25, if needed). Location: Grundy County I-24 East Bound at MM 132.9 Time: Night work – STC will set up traffic control after 7:00 PM and the work will continue until 3:00-5:00 AM Friday morning.
GRUNDY COUNTY SR-2 (US-41) TDOT Contractor westbound from LM 7.2 to LM 7.4:Â on 09/15/25 and 09/16/25, TDOT contractors will close the westbound lane and operate a single flagging-controlled lane in both directions through the work zone. (FORD / AWP Traffic Control)
GRUNDY COUNTY SR-56 [5.42-7.81] from Montgomery Street to Des Church Road resurfacing:Â The contractor will have lane closures during daylight hours from 5 AM to 9 PM for paving and related operations as needed. Flaggers will be present during the lane closure operations, and at least one lane will remain open at all times.





